26Sep
BOULDER HEIGHTSESTATES SUBDIVISION
Central Paving Provides 5 Phases of Grading to Prepare for a Beautiful Hillside Subdivision
Highlights: Mass grading (approx. 90,000 CY) of hillside subdivision. Excavation of rock and soils for streets and engineered lots. Paved ACHD roadway improvements. Grading and topsoil placement on slopes. Revegetation establishment in poor topsoil conditions.
Owner: J.H. Wise and Son Inc.
Contact: Jeff Snyder (208) 941-8804br/> Location: Windsong Drive, Boise Idahobr/> Dates: March 2004 – Oct 2013
Cost: $3.5 Million